Right now, we’re in the slow stage of the bathroom remodel. We’re waiting for the the bathtub surround, vanity and sinktop to deliver from their manufacturers. So our contractor worked on the drywall this week. He also reinstalled the recessed lights that were previously over the sink.
As he installed the bathtub, our contractor noticed that the floor joists under the tub were starting to split. We definitely need those to help support the weight of the tub! So this week he repaired the floor joists by reinforcing them with some concrete footings.
We expect the bathtub surround to be delivered and installed any day now. It’s frustrating that we can’t do anything until the manufacturers deliver the items!